Skip to main content

Practical Reports

Practice Report 47

Practice Report 47

Clean ventilation for the most modern machine-tool factory in Europe

Clean air for factory and office building with a total volume of 24.400 m³/h

Download pdf (506 KB)
Practice Report 46

Practice Report 46

Restoration of a sports hall in Solingen

Sporting top-performance with up to 6 x 2.500 m³/h fresh supply air volume
 

Download pdf (1 MB)
Practice Report 45

Practice Report 45

Reconstruction of the "Blomenburg" to a private psychosomatic clinic

Download pdf (1 MB)
Practice Report 44

Practice Report 44

Production hall with cleanroom technology

Download pdf (2 MB)
Practice Report 43

Practice Report 43

Ventilation for an industrial bakery in Wittenberg
Factory hall with long air conduction: 250 m VENTAFLEX® oval "in one piece"

Download pdf (1 MB)
Practice Report 42

Practice Report 42

Clean air for meat processing

Veld Koeltechniek and VENTAFLEX - Once again a cross-border cooperation

Download pdf (1 MB)
Practice Report 41

Practice Report 41

Ventilation of the exhibition halls in Friedrichshafen

Download pdf (1 MB)
Practice Report 40

Practice Report 40

New building of a vocational college in Hamburg
Collaborative work when optimizing air guidance saves 1/3 of the originally planned budget

 

Download pdf (2 MB)
Practice Report 39

Practice Report 39

New building of a slaughtery house

180.000 m³/h total air flow rate for optimal working conditions

Download pdf (808 KB)
Practice Report 38

Practice Report 38

Hall roof with static challenge

Modernization of an ventilation system on an existing shed roof. Total air volume >140.000 m³/h for an automotive supplier in south Germany

Download pdf (2 MB)
Practice Report 37

Practice Report 37

New construction of a washing facility for large aircrafts

2 x 50.000 m³/h top performance for a clean result

Download pdf (2 MB)
Practice Report 36

Practice Report 36

Production hall with specific demands

Air supply for 6.000 m² production area

Download pdf (1 MB)
Practice Report 35

Practice Report 35

Factory Cafeteria Extension: fresh Air for Employees

Download pdf (920 KB)
Practice Report 34

Practice Report 34

Arts and leisure center Ludwigsfelde: Complex air duct in a confined space

Download pdf (976 KB)
Practice report 33

Practice report 33

Beverage factory Wörth am Rhein: Well defined process air for the complete process chain in a single Bottling plant

Download pdf (1,002 KB)
Practice report 32

Practice report 32

Kristal Palm Beach Nürnberg: Significant savings in the water Park

Download pdf (464 KB)
Practice report 31

Practice report 31

Without risk of corrosion: VENTAFLEX® wet air chimney for a brick factory.

Download pdf (367 KB)
Practice report 30

Practice report 30

"MAGIC MOUNTAIN Berlin": Air guidance from an air-conditioning system installed outdoors, into the climbing hall

Download pdf (376 KB)
Practice report 29

Practice report 29

AVZ Münster: Renewal of the ventilation system for the clean room of a research center

Download pdf (1 MB)
Practice report 28

Practice report 28

Focke Museum in Bremen: Aesthetics and technology in perfect harmony.

Download pdf (451 KB)
Practice report 27

Practice report 27

Exclusive air duct – Renewal of the ventilation system of the Grand Hotel Huis ter Duin in the Netherlands

Download pdf (2 MB)
Practice Report 24

Practice Report 24

New construction of an elephant house in Rostock:
Air guidance under extreme conditions

Download pdf (699 KB)
Practice Report 23

Practice Report 23

Air duct system with underground, in- and outdoor installation for the reliable outlet of contaminated air.

Download pdf (618 KB)
Practice Report 22

Practice Report 22

Reconstruction of a church to a conference centre:
Optimum space-saving underground performance system for the ventilation of several conference rooms.

Download pdf (625 KB)
Practice Report 21

Practice Report 21

Pharmaceutical group Berlin: Renovation of ventilation system
Ventilation system for challenging statical requirements and air volume up to 45.000 m³

Download pdf (596 KB)
Practice Report 20

Practice Report 20

St. Elisabeth-Hospital in Leipzig:
underground air supply through five duct dimensions

Download pdf (700 KB)
Practice Report 19

Practice Report 19

Laboratory in Rülzheim: Ventilation system with visible installation
Volume flow: max. 20.000 m³/ h with flow velocity: approx. 6m/s and connection to textile air hoses in the interior area

Download pdf (525 KB)
Practice report 18

Practice report 18

Ventilation system in the duct dimension 920mm, installation in the in- and outdoor area of the production hall

Download pdf (1 MB)

Top-Downloads

VENTAFLEX® catalog 2020

VENTAFLEX® catalog 2020

All air duct products, technical details, supplies and installation instructions can be found in our general catalog.

Download pdf (8 MB)
Installation instruction VENTAFLEX® air duct round

Installation instruction VENTAFLEX® air duct round

  • Installation of VENTAFLEX® air ducts with VENTASNAP and VENTAFIX
  • Glueing of VENTAFLEX® air ducts
  • Installation of a compensator for the expansion compensation
Download pdf (693 KB)
Installation instruction VENTAFLEX® air duct for underground installation

Installation instruction VENTAFLEX® air duct for underground installation

  •  Recommended measures for installation

  • Application VentaSnap + adhesion

  • Length adjustment of air ducts

  • Creation of a wall duct

  • Installation wall collar

Download pdf (1 MB)

Top-News

Chiron Group SE decided on air guidance with the VENTAFLEX® system when building the new factory

Read more

Energetic renovation of a building structure of the 1970s

Read more

Renovation of the „Blomenburg“: underground air ducts transport 5.250 m³/h air volume into the historic building

Read more